
Basement Walkout Construction
The full build: excavation, footings, retaining walls, concrete stairwell, exterior door, threshold flashing, drainage, and waterproofing. Designed for sloped lots, flat lots, and tight Ottawa side-yard access.
$25,000 – $42,000Full project scope






